Skip to content

IBO® and HEB sheet piles and cover profiles
for a redevelopment in Dortmund

IBO® and HEB sheet piles and cover profiles for a redevelopment in Dortmund

During bombing raids in World War II, train cars full of Oil were drained over this area. This sheet pile pit stands around the contaminated area. 

To clean the contamination, a sheet pile construction with a concrete floor is installed to create a basin. On one side the sheet piles have been provided with 10.000 holes and the basin is filled with special grit, so the oil can run trough the holes and stays in place in the basin in the grit. Later on the oil will be disposed by pumping it away and by refreshing the grit. For this project we have delivered a total of 190 tons.

Type

Length

Steel grade

IBO® 1383-10

5,00-6,00 mtr.

S355

HEB200

1,15-9,00 mtr.

S235

Cover profiel

6,00 mtr

50 x 370 x 50 x 8

 