IBO® Sheet Piles, HEB Beams and Sheet Pile Cap
for a redevelopment in Dortmund
IBO® Sheet Piles, HEB Beams and Sheet Pile Cap for a redevelopment in Dortmund
During bombing raids in World War II, train wagons full of oil were drained over this area. This sheet pile pit stands in the contaminated area.
To clean the contamination, a sheet pile construction with a concrete floor is installed to create a basin. The sheet piles have been provided with 10.000 holes and the basin is filled with special grit, so the oil can run trough the holes and stays in place in the grit. Later on the oil will be disposed by pumping it away and by refreshing the grit. For this project we delivered a total of 190 tons.
Type | Length | Steel grade |
IBO® 1383-10 | 5,00-6,00 mtr. | S355 |
HEB200 | 1,15-9,00 mtr. | S235 |
Sheet Pile Cap | 6,00 mtr 50 x 370 x 50 x 8 |